Reconstruction of the bridge over the Stradomka river in the town of Kamyk along the borough road No. K580178 Kamyk – beyond the river at km 0 + 050 of the road – Stage II
Date of execution: 19.08.2019 – 09.12.2019
Investor: Gmina Łapanów 32-740 Łapanów 34
Principal: MOSTMARPAL Sp. z o.o. ul. Piastowska 53, 34-326 Pietrzykowice